Does the meter need to be changed? And is there a cost?
Yes, HILCO will need to exchange the meter so that it is capable of net metering along with a final inspection of your installation to ensure the safety of our employees. There will be a cost during the installation for every trip that we make to your location. The number of trips will be determined by the coordination of the disconnection and reconnection of service during the solar installation.